Search by property
From CSDMS
						
						This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Model:FTCS1D-NonLinear + (--)
 - Model:BackwaterWrightParker + (--)
 - Model:The TELEMAC system + (--)
 - Model:CryoGrid3 + (--)
 - Model:1DBreachingTurbidityCurrent + (--)
 - Model:DVMDOSTEM + (--)
 - Model:PermafrostBankErosionModel + (--)
 - Model:CMFT + (1 day)
 - Model:FVshock + (1 hour - several days)
 - Model:SLAMM 6.7 + (1 hour to 24 hours)
 - Model:CoastMorpho2D + (1 hr)
 - Model:SRH-1D + (1 min to 1 day)
 - Model:Cliffs + (1 sec - few hrs, depending on 1D or 2D, grid size, and length of simulation)
 - Model:Wetland3P + (1 second)
 - Model:SurfaceRoughness + (1-30 minutes)
 - Model:RASCAL + (1-7 days)
 - Model:WACCM-EE + (1.5 days per model year on 8 processor mac)
 - Model:SINUOUS + (10-50 minutes depending on domain size and duration of simulation)
 - Model:CarboLOT + (2 hours for 1000 year run)
 - Model:ThawLake1D + (2 hrs for 1000 year simulation)
 - Model:GEOMBEST + (2 minutes to 2 hours depending on time step size and grid cell size)
 - Model:GPM + (20 minutes)
 - Model:Marsh column model + (20 minutes for 1000 years simulation)
 - Model:FACET + (20-45 minutes)
 - Model:WACCM-CARMA + (2days)
 
- Model:WBMsed + (3 hours per year for global simulation at 6 arc-min resolution)
 
- Model:Hilltop flow routing + (3 hours to 3 days)
 - Model:Mosartwmpy + (30 minutes per simulated year)
 - Model:SNOWPACK + (30s for one year at one point, at most 180s with the most complex liquid water transport model.)
 - Model:Badlands + (30s to several days)
 - Model:Caesar + (5 min to 50 days)
 - Model:FuzzyReef + (5 minutes)
 - Model:CarboCAT + (5 minutes)
 - Model:Hogback + (5 minutes)
 - Model:GSFLOW-GRASS + (5 minutes)
 - Model:MarshPondModel + (5 minutes)
 - Model:SimClast + (5 minutes up to 24 hours)
 - Model:LateralVerticalIncision + (5 to 30 mn.)
 - Model:GEOMBEST-Plus + (5 years model time per second)
 - Model:River Erosion Model + (5-10 minutes for single run; hours for Monte Carlo runs)
 - Model:WEPP + (<1 minute for hillslope simulations)
 - Model:Symphonie + (A few days for annual runs)
 - Model:Chi analysis tools + (A few minutes to several days depending on parameters and DEM size)
 - Model:ENTRAIN + (A few seconds)
 - Model:ENTRAINH + (A few seconds)
 - Model:FLDTA + (A few seconds)
 - Model:TURB + (A few seconds)
 - Model:YANGs + (A few seconds)
 - Model:LITHFLEX1 + (A few seconds)
 - Model:LOGDIST + (A few seconds)
 - Model:SVELA + (A few seconds)
 
