Meeting:Abstract 2011 CSDMS meeting-046: Difference between revisions
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
<!--{{CSDMS meeting program template | |||
|CSDMS meeting first hydrological choice=TopoFlow | |||
|CSDMS meeting second hydrological choice=ParFlow | |||
|CSDMS meeting first terrestrial choice=CHILD | |||
|CSDMS meeting second terrestrial choice=MARSSIM | |||
|CSDMS meeting first coastal choice=I am not interested | |||
|CSDMS meeting first marine choice=I am not interested | |||
|CSDMS meeting first carbonate choice=I am not interested | |||
|CSDMS meeting first tool choice=GRASS | |||
}}--> | |||
{{CSDMS meeting personal information template | {{CSDMS meeting personal information template | ||
|CSDMS meeting first name=Stefano | |CSDMS meeting first name=Stefano | ||
Line 29: | Line 39: | ||
}} | }} | ||
{{blank line template}} | {{blank line template}} | ||
{{CSDMS meeting program template1 | |||
|CSDMS meeting first | |CSDMS meeting first day choice=TopoFlow | ||
|CSDMS meeting second | |CSDMS meeting second day choice=CHILD | ||
|CSDMS meeting third day choice=CMT | |||
|CSDMS meeting | }} | ||
}} | |||
{{CSDMS meeting logistics template | {{CSDMS meeting logistics template | ||
|Attend all days=Yes | |Attend all days=Yes |
Revision as of 02:15, 1 October 2011
Browse abstracts
A wavelet-based DEM regularization methodology aimed at improving distributed rainfall-runoff modeling
[[Image:|300px|right|link=File:]]In this study, a methodology based on a multi-resolution wavelet analysis is introduced to extract a regularized topographic index (TI) distribution from a high-resolution DEM (digital elevation model). The methodology is a promising method to deal with common problems in hydrological applications of high-resolution DEMs, which usually contain noise, pits and redundant information. Formation of several unconnected saturated zones is a particular case of such problems when TOPMODEL is employed for simulation of hydrological processes within a basin. The proposed method includes four steps. The first two steps are used for smoothing and de-noising purposes and include decomposition of the original DEM into multi-level sub-signals by 2-dimentional discrete wavelet transform (DWT) and thresholding of the wavelet coefficients. In the next step, the original smoothed and filtered DEM is reconstructed using inverse DWT. Finally, the TI distribution and its information content are computed. The computed information content is used as a metric to identify an optimal TI distribution which contains reasonable topography information in the absence of noise and redundancy. Application of the procedure to 1-m resolution LiDAR (light detection and ranging) DEM of the Elder Creek River watershed via the TOPMODEL framework indicates its filtering ability to smooth and connect the saturated areas during the hydrological process. In addition to the rainfall-runoff modeling, the proposed pre-processing technique may be applied wherever a high-resolution DEM is employed for distributed simulation of hydro-environmental processes.