HPCCprojects:Niger Delta Project: Difference between revisions
From CSDMS
m (→Results) |
mNo edit summary |
||
Line 27: | Line 27: | ||
==Results== | ==Results== | ||
{|cellspacing="0" cellpadding="2 | {|cellspacing="0" cellpadding="2" style="color:white" | ||
|bgcolor="gray"|[[image:Niger_delta_project.png|400px | |bgcolor="gray"|[[image:Niger_delta_project.png|400px]] | ||
|- | |- | ||
|bgcolor="gray" align="center"| Niger Delta drainage basins and outlets | |bgcolor="gray" align="center"| Niger Delta drainage basins and outlets |
Revision as of 16:26, 4 November 2010
Niger Delta Project
Project description
Provide a brief description of what your project is all about
Objectives
List the main objectives of your project
Time-line
Start date: 2008
End date: 2010
Models used
Results
Niger Delta drainage basins and outlets |
Users
Funding
--
Publications and Presentations
--
Links
This would be the place to provide links that are related to your project.
Choose one of the two categories mentioned below, that your project suites the best