Roadmap:Flexure: Difference between revisions
From CSDMS
m (Add some dates, fix links) |
m (Text replacement - "http://csdms.colorado.edu" to "https://csdms.colorado.edu") |
||
(10 intermediate revisions by 3 users not shown) | |||
Line 9: | Line 9: | ||
| project owner email = email@colorado.edu | | project owner email = email@colorado.edu | ||
| project owner start date = 06/02/2011 | | project owner start date = 06/02/2011 | ||
| project estimated finish date = 12/31/2012 | |||
| questionnaire fill out by = Andy Wickert | | questionnaire fill out by = Andy Wickert | ||
| questionnaire link = {{PAGENAME}} | | questionnaire link = {{PAGENAME}} | ||
| questionnaire finished by = | | questionnaire finished by = 12/07/2010 | ||
| source code uploaded by = Andy Wickert | | source code uploaded by = Andy Wickert | ||
| source code status = Done | | source code status = Done | ||
| source code link = Special:ExtensionDistributor/{{PAGENAME}} | | source code link = Special:ExtensionDistributor/{{PAGENAME}} | ||
| source code finished by = | | source code finished by = 12/07/2010 | ||
| IO uploaded by = Andy Wickert | | IO uploaded by = Andy Wickert | ||
| IO status = Done | | IO status = Done | ||
| IO link = | | IO link = https://csdms.colorado.edu/svn/flexure/trunk | ||
| IO finished by = | | IO finished by = 12/07/2010 | ||
| compile source code by = Eric Hutton | | compile source code by = Eric Hutton | ||
| compile status = Done | | compile status = Done | ||
| compile link = | | compile link = https://csdms.colorado.edu/pub/users/huttone/build_notes/BUILD_NOTES-flexure-0.1.html | ||
| compile check finished by = 06/02/2011 | | compile check finished by = 06/02/2011 | ||
| IRF interface done by = Greg Tucker | | IRF interface done by = Greg Tucker, Andy Wickert, Beichuan Yan | ||
| IRF interface status = Done | | IRF interface status = Done | ||
| IRF interface link = https://csdms.colorado.edu/svn/flexure/branches | | IRF interface link = https://csdms.colorado.edu/svn/flexure/branches | ||
| IRF interface finished by = 05/19/2011 | | IRF interface finished by = 05/19/2011, 07/29/2011 | ||
| getters-setters done by = | | getters-setters done by = Andy Wickert | ||
| getters-setters status = | | getters-setters status = Done | ||
| getters-setters link = | | getters-setters link = https://csdms.colorado.edu/svn/flexure/branches/awickert | ||
| getters-setters finished by = | | getters-setters finished by = 10/19/2011 | ||
| CCA component done by = | | CCA component done by = Andy Wickert | ||
| CCA component status = | | CCA component status = Done | ||
| CCA component link = None | | CCA component link = None | ||
| CCA component finished by = mm/dd/yyyy | | CCA component finished by = mm/dd/yyyy | ||
Line 49: | Line 51: | ||
| build GUI finished by = mm/dd/yyyy | | build GUI finished by = mm/dd/yyyy | ||
| template input done by = | | template input done by = Andy Wickert, Beichuan Yan | ||
| template input status = | | template input status = Done | ||
| template input link = | | template input link = https://csdms.colorado.edu/svn/flexure/tags/0.3 | ||
| template input finished by = mm/dd/yyyy | | template input finished by = 08/08/2011 | ||
| stand alone documentation done by = Name | |||
| stand alone documentation status = Pending | |||
| stand alone documentation link = None | |||
| stand alone documentation finished by = mm/dd/yyyy | |||
| stand alone sample BLD done by = Name | |||
| stand alone sample BLD status = Pending | |||
| stand alone sample BLD link = None | |||
| stand alone sample BLD finished by = mm/dd/yyyy | |||
| | | stand alone testing done by = Andy Wickert | ||
| | | stand alone testing status = Done | ||
| | | stand alone testing link = None | ||
| | | stand alone testing finished by = 10/29/2011 | ||
| sample BLD done by = Name | | sample BLD done by = Name | ||
Line 64: | Line 76: | ||
| sample BLD finished by = mm/dd/yyyy | | sample BLD finished by = mm/dd/yyyy | ||
| | | coupled documentation done by = Name | ||
| | | coupled documentation status = Pending | ||
| | | coupled documentation link = None | ||
| | | coupled documentation finished by = mm/dd/yyyy | ||
| coupled sample BLD done by = Name | |||
| coupled sample BLD status = Pending | |||
| coupled sample BLD link = None | |||
| coupled sample BLD finished by = mm/dd/yyyy | |||
| | | coupled testing done by = Name | ||
| | | coupled testing status = Pending | ||
| | | coupled testing link = None | ||
| coupled testing finished by = mm/dd/yyyy | |||
}} | }} |
Latest revision as of 17:30, 19 February 2018
Roadmap Flexure component status:
Milestone: Executable
Milestone: Standalone component
Milestone: Coupled component
|