Reference:Reference-001296: Difference between revisions

From CSDMS
(Bot: Automated import of articles *** existing text overwritten ***)
No edit summary
 
Line 16: Line 16:
|PublicationClusterID=0
|PublicationClusterID=0
|MS_PublicationClusterID=1581159452
|MS_PublicationClusterID=1581159452
|Semantic_ID=b58819274e6096a88f2c950e57f8cf9ae60e2e59
|PublicationWhatKindOf=a module application description
|PublicationWhatKindOf=a module application description
|PublicationNrofModels=a single module
|PublicationNrofModels=a single module

Latest revision as of 11:57, 14 January 2022



Author(s) Wenzel, Friedemann; Zschau, Jochen; Goseberg, N.; Lämmel, G.; Taubenböck, H.; Setiadi, N.; Birkmann, J.; Schlurmann, T.;
BibType bookSection
Title The Last-Mile Evacuation Project: A Multi-disciplinary Approach to Evacuation Planning and Risk Reduction in Tsunami-Threatened Coastal Areas
Editors
Year 2014-01-01
Journal
Booktitle Early Warning for Geological Disasters
Volume
Pages 207–226
URL http://link.springer.com/10.1007/978-3-642-12233-0_11
DOI
ISBN
Note Auto downloaded ref at: 2019-12-31


 
Feature reference No
PublicationClusterID 0
MS_PublicationClusterID 1581159452
Semantic_ID b58819274e6096a88f2c950e57f8cf9ae60e2e59
Nr of citations 2
Sort of publication a module application description
Sort of model publication a single module
Is the CSDMS HPC used No
If HPC is used, for what project was it?:
Associated simulation movie if any:


Model(s) discussed: Anuga