Reference:Reference-008288
From CSDMS
| Name | Jia, Yanbing |
| Name | Culver, Teresa B. |
| Kind of article | journalArticle |
| Title | Uncertainty Analysis for Watershed Modeling Using Generalized Likelihood Uncertainty Estimation with Multiple Calibration Measures |
| Publication title | Journal of Water Resources Planning and Management |
| Book title | |
| Journal Abbreviation | |
| Volume | 134 |
| Issue | 2 |
| URL | https://ascelibrary.org/doi/10.1061/%28ASCE%290733-9496%282008%29134%3A2%2897%29 |
| DOI | 10.1061/(ASCE)0733-9496(2008)134:2(97) |
| Page numbers | 97–106 |
| Publication date | 2008-03 |
| Access date | 2025-10-23
|
| |
|
| Feature reference | No |
| PublicationClusterID | 0 |
| MS_PublicationClusterID | 2168828433 |
| Semantic_ID | {{{Semantic_ID}}} |
| Nr of citations | Template:SEM |
| Sort of publication | a module application description |
| Sort of model publication | a single module |
| Is the CSDMS HPC used | No |
| If HPC is used, for what project was it?: | |
| Associated simulation movie if any: |
|
| Model(s) discussed: | HSPF
|
