Reference:Reference-022040: Difference between revisions
From CSDMS
m Automated cleanup of duplicate |CorpusID= lines |
Tag: Undo |
||
| Line 17: | Line 17: | ||
|MS_PublicationClusterID=0 | |MS_PublicationClusterID=0 | ||
|Semantic_ID=4b53e39541407113b4a0aa0703152f9da773dbd8 | |Semantic_ID=4b53e39541407113b4a0aa0703152f9da773dbd8 | ||
|CorpusID=261312684 | |||
|CorpusID=261312684 | |CorpusID=261312684 | ||
|PublicationWhatKindOf=a module application description | |PublicationWhatKindOf=a module application description | ||
Revision as of 10:11, 6 October 2024
| Author(s) | Liu, Yin; Jiang, Yunzhong; Zhang, Shuanghu; Wang, Dan; Chen, Huan; |
| BibType | journalArticle |
| Title | Application of a Linked Hydrodynamic–Groundwater Model for Accurate Groundwater Simulation in Floodplain Areas: A Case Study of Irtysh River, China |
| Editors | |
| Year | 2023-08-27 |
| Journal | Water |
| Booktitle | None |
| Volume | 15 |
| Pages | 3059 |
| URL | https://www.mdpi.com/2073-4441/15/17/3059 |
| DOI | 10.3390/w15173059 |
| ISBN | |
| Note | Auto downloaded ref at: 2024-08-29
|
| |
|
| Feature reference | No |
| PublicationClusterID | 0 |
| MS_PublicationClusterID | 0 |
| Semantic_ID | 4b53e39541407113b4a0aa0703152f9da773dbd8 |
| Nr of citations | 3 |
| Sort of publication | a module application description |
| Sort of model publication | a single module |
| Is the CSDMS HPC used | No |
| If HPC is used, for what project was it?: | |
| Associated simulation movie if any: |
|
| Model(s) discussed: | The TELEMAC system
|
