Reference:Reference-022092: Difference between revisions
From CSDMS
Created page with "{{CSDMS reference template cargo |DOIentry=10.2166/hydro.2024.248 }} {{RefsInt1 |FeatureRef=No |PublicationClusterID=0 |MS_PublicationClusterID=0 |Semantic_ID=f8936b6cd4c31f229337fe58a05977e917f11dbb |PublicationWhatKindOf=a module application description |PublicationHPCCYesno=No |PublicationNrofModels=a single module }} {{RefsInt2 |PublicationMultipleModelsCargo=The TELEMAC system }} {{RefsInt3}}" |
m Text replacement - "None" to "" |
||
(2 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{ | {{BibEntryCargo | ||
| | |Firstname=Zhang, Haijia; Liu, Jiahong; Mei, Chao; Dong, Lirong; Song, Tianxu; | ||
|BibType=journalArticle | |||
|Title=Construction of hydrological and hydrodynamic models based on ARM architecture processor – A case study of inner Harbor area of Macao Peninsula | |||
|Year=2024-05-01 | |||
|Journal=Journal of Hydroinformatics | |||
|Booktitle= | |||
|Volume=26 | |||
|Pages=1014–1041 | |||
|URL=https://iwaponline.com/jh/article/26/5/1014/101613/Construction-of-hydrological-and-hydrodynamic | |||
|DOI=10.2166/hydro.2024.248 | |||
|Note=Auto downloaded ref at: 2024-08-29 | |||
}} | }} | ||
{{RefsInt1 | {{RefsInt1 | ||
Line 7: | Line 17: | ||
|MS_PublicationClusterID=0 | |MS_PublicationClusterID=0 | ||
|Semantic_ID=f8936b6cd4c31f229337fe58a05977e917f11dbb | |Semantic_ID=f8936b6cd4c31f229337fe58a05977e917f11dbb | ||
|CorpusID=0 | |||
|PublicationWhatKindOf=a module application description | |PublicationWhatKindOf=a module application description | ||
|PublicationNrofModels=a single module | |||
|PublicationHPCCYesno=No | |PublicationHPCCYesno=No | ||
}} | }} | ||
{{RefsInt2 | {{RefsInt2 | ||
|PublicationMultipleModelsCargo=The TELEMAC system | |PublicationMultipleModelsCargo=The TELEMAC system | ||
}} | }} | ||
{{RefsInt3}} | {{RefsInt3 | ||
|PublicationAnimationsCargo= | |||
}} |
Latest revision as of 11:45, 12 November 2024
Author(s) | Zhang, Haijia; Liu, Jiahong; Mei, Chao; Dong, Lirong; Song, Tianxu; |
BibType | journalArticle |
Title | Construction of hydrological and hydrodynamic models based on ARM architecture processor – A case study of inner Harbor area of Macao Peninsula |
Editors | |
Year | 2024-05-01 |
Journal | Journal of Hydroinformatics |
Booktitle | |
Volume | 26 |
Pages | 1014–1041 |
URL | https://iwaponline.com/jh/article/26/5/1014/101613/Construction-of-hydrological-and-hydrodynamic |
DOI | 10.2166/hydro.2024.248 |
ISBN | |
Note | Auto downloaded ref at: 2024-08-29
|
|
|
Feature reference | No |
PublicationClusterID | 0 |
MS_PublicationClusterID | 0 |
Semantic_ID | f8936b6cd4c31f229337fe58a05977e917f11dbb |
Nr of citations | 0 |
Sort of publication | a module application description |
Sort of model publication | a single module |
Is the CSDMS HPC used | No |
If HPC is used, for what project was it?: | |
Associated simulation movie if any: |
|
Model(s) discussed: | The TELEMAC system
|