Reference:Reference-016892: Difference between revisions
From CSDMS
Bot: Automated import of articles *** existing text overwritten *** |
No edit summary |
||
| Line 17: | Line 17: | ||
|MS_PublicationClusterID=0 | |MS_PublicationClusterID=0 | ||
|Semantic_ID=ee41c66fe4e1f68e94f58b2ee44ea954ad59e545 | |Semantic_ID=ee41c66fe4e1f68e94f58b2ee44ea954ad59e545 | ||
|CorpusID=0 | |||
|PublicationWhatKindOf=a module application description | |PublicationWhatKindOf=a module application description | ||
|PublicationNrofModels=a single module | |PublicationNrofModels=a single module | ||
Latest revision as of 17:21, 9 October 2024
| Author(s) | Kim, Jong-Tae; Chung, Il Moon; Kim, Nam Won; Jeong, Gyo-Cheol; |
| BibType | journalArticle |
| Title | Feasibility Study of a Groundwater Dam in Osibcheon, using SWAT-MODFLOW |
| Editors | |
| Year | 2011-06-30 |
| Journal | The Journal of Engineering Geology |
| Booktitle | |
| Volume | 21 |
| Pages | 179–186 |
| URL | https://doi.org/10.9720/KSEG.2011.21.2.179 |
| DOI | 10.9720/KSEG.2011.21.2.179 |
| ISBN | |
| Note | Auto downloaded ref at: 2022-02-19
|
| |
|
| Feature reference | No |
| PublicationClusterID | 0 |
| MS_PublicationClusterID | 0 |
| Semantic_ID | ee41c66fe4e1f68e94f58b2ee44ea954ad59e545 |
| Nr of citations | 5 |
| Sort of publication | a module application description |
| Sort of model publication | a single module |
| Is the CSDMS HPC used | No |
| If HPC is used, for what project was it?: | |
| Associated simulation movie if any: |
|
| Model(s) discussed: | MODFLOW
|
