Reference:Reference-009530
From CSDMS
Publication information
| Author(s) | Piotrowski, Adam P.; Napiorkowski, Jaroslaw J.; Osuch, Marzena; |
| BibType | journalArticle |
| Title | Relationship Between Calibration Time and Final Performance of Conceptual Rainfall-Runoff Models |
| Year | 2019-01-01 |
| Journal | Water Resources Management |
| Volume | 33 |
| Pages | 19–37 |
| URL | http://link.springer.com/10.1007/s11269-018-2085-3 |
| DOI | 10.1007/s11269-018-2085-3 |
| Note | Auto downloaded ref at: 2020-06-26 |
Open Access
| Icon | Status | Best URL | Best PDF URL | License | Version | Last checked |
|---|---|---|---|---|---|---|
| hybrid | cc-by | publishedVersion | 2026-08-31 |
Download locations
| URL | Host | License | Version | |
|---|---|---|---|---|
| link | publisher | cc-by | publishedVersion |
Additional information
| |
||
| Highlighted paper on group site | No | |
| Highlight text | ||
| Highlight image | ||
| Which groups | ||
| Feature reference | No | |
| Semantic_ID | f1bfcc4cdcdb487caeed6dbf407a88330bd92a3d | |
| Nr of citations | 8 | |
| Sort of publication | a module application description | |
| Sort of model publication | a single module | |
| Is the CSDMS HPC used | No | |
| If HPC is used, for what project was it?: | ||
| Associated simulation movie if any: |
| |
| Model(s) discussed: | HBV |
